Monday, July 11, 2016

The Day Has Arrived

Today our abatement contractor was on-site and began preparing for the abatement of asbestos floor tile in the hallways near the auditorium and Gym A (formerly the "Girls' Gym").

Abatement preparation in the C Hallway

Abatement preparation outside of the auditorium