Today our abatement contractor was on-site and began preparing for the abatement of asbestos floor tile in the hallways near the auditorium and Gym A (formerly the "Girls' Gym").
|
Abatement preparation in the C Hallway |
|
Abatement preparation outside of the auditorium |
No comments:
Post a Comment